On 16 February 2011, NERSA approved the Grid Connection Requirements for Wind Energy Facilities (WEFs). The primary objective of this document is to establish technical connection conditions for WEFs connected to the South African electricity transmission or distribution networks. It sets out rules and obligations with which participants must comply in order to connect WEFs to the South African electricity networks.