“Gestamp Wind Steel will have a facility located in Cape Town area with a required workforce over 250 people that will be able to manufacture around 200 steel wind towers per year. Gestamp Solar Steel in turn will deploy a facility located in Johannesburg area, with a required workforce over 115 people capable of manufacturing PV and CSP technologies steel structures for 350 MW per year”
REVE – Regulación Eólica con Vehículos Eléctricos –:
‘via Blog this’